Replacement
of PG Cooler for Gulf Petrochemicals Industries Co.
(GPIC)
Scope
of Work:
-
Remove existing Steam Drum & Ammonia Process
Gas Cooler.
-
Install new PG Cooler & reinstate existing Steam
Drum.
-
Perform all testing & assist Start-up.
Client:
Gulf Petrochemicals Industries Co. (GPIC)
Location: GPIC Plant, Bahrain.
Project
Highlights:
-
Heavy Rigging of 110 Tonnes of PG Cooler and 77 Tonnes
of Steam Drum
-
Cutting & weld preparation of heavy schedule piping
by in-situ machining
-
Application of advanced NDT method of ToFD Ultrasonic
Testing on heavy schedule butt welds
-
21 day shutdown execution programme was completed
3 days ahead of schedule.
Project
Value: US $ 850, 000.00
Project
Execution Duration: 18 Days (2005 April)
Manhours:
19, 103 (zero NLTA)
|

|
Anode
Rodding, Butt Recycling & Rodded Anode Storage Building
Civil & Structural Works
Scope
of Work:
-
Prepare Green Field site for building construction.
Approx. 25, 000 M2
-
Construct 3 large steel structure building, complete
with roofing, ventilation, sidings, louvers &
lighting.
-
Construct & commission other integral service
buildings such as Control, Hydraulic & Furnace
Rooms.
Client
/ Owner: Bechtel / Aluminium Bahrain
Location: Alba Pot Line 5, Bahrain
Project
Highlights:
-
Heavy concrete foundations & grade slabs in excess
of 10, 000 M3
-
Fabrication and installation of more than 2000 Tonnes
of Structural Steel
-
Roofing and Cladding of Structural Steel Buildings
of more than 20, 000 M2
Project
Value: US $ 8, 545, 000.00
Project Execution Duration: 12 months (2004 –
05)
Manhours: 377, 453 (zero NLTA)
|

|
Aboveground
and Underground Services
Scope
of Work:
Design, procurement, installation, testing and commissioning
of about 50 kms of aboveground and underground pipelines
and a firewater tank. The pipeline network covers the
entire area of Alba Line 5 Expansion project.
Client
/ Owner: Bechtel / Aluminium Bahrain
Location: Alba Line 5
Project
Highlights:
-
Surveyed, designed, procured, installed, tested
and commissioned underground & aboveground pipelines
(sizes 1” to 16” of different materials
including Carbon steel, GRE, Brass and Stainless
Steel with more than 50, 000 Inch dia.). Underground
pipeline work includes all the civil construction
activities.
-
Designed, procured, constructed, tested and commissioned
a Firewater Tank of size 11.0 m diameter x 11.3
m height. Work also included installation of pump
station.
Project
Value: US $ 3, 500, 000.00
Project Execution Duration: 14 months (2004-05)
Manhours: 347, 603 (zero NLTA)
|

|
Mechanical
Work for Anode Bake Furnace & Anode Storage Building
Scope
of Work:
-
Installation of all the Mechanical Equipment for
the Anode Bake Furnace and Anode Storage Building
-
Associated works include piping and insulation
-
Scope of work also include testing and commissioning
of all the equipment units and piping systems
Client
/ Owner: Bechtel / Aluminium Bahrain
Location: Alba Line 5
Project
Highlights:
-
Installed, tested and commissioned 11 cranes
-
Installed, tested and commissioned 4 systems of piping
of various sizes and a total welding of 6000 Inch
dia.
-
Installed and tested 400 m of fume ducts of 1 m dia.
-
Assembled, installed, aligned, and grouted 2 m dia.
cross over ducts for the furnaces.
-
Assembled and installed 500 m of Roller conveyors
-
Fabricated and installed 50 Tonnes of Structural steel
Project
Value: US $ 2, 300, 000.00
Project
Execution Duration: 12 months (2004-05)
Manhours:
236, 383 (zero NLTA)
|
| |
Construction
of New Compressor Station No. 7 for Bahrain National
Gas
Scope
of Work:
-
Prepare Green Field site for construction of new Gas
Compressor Station
-
Construct, install complete station inclusive of sub
grade services, foundations, fabrication, equipment,
structural, piping, E & I, fireproofing, roads,
asphalt & control rooms.
-
Fabricate & lay 50 kms of 2” – 24”
pipeline to tie in the CS to the Gas Plant & other
satellite stations.
-
Testing & commissioning of all installation.
Client
/ Owner: JGC Corporation / Banagas
Location: Banagas
Project
Highlights:
-
More than 1000 M3 concrete work including Gas Turbine
Foundation (210 M3).
-
A total welding of 105, 000 inch dia. of pipeline
and 23, 000 inch dia. of piping
-
Installation of 17 heavy equipments in the new compressor
station including 80 Tonnes Turbine
-
Hot tapping at 12 locations
Project Value: US $ 5, 785, 000.00
Project Execution Duration: 16 months (2002 –
03)
Manhours: 749, 930
|
 |
Kero-Merox
Project for Bahrain Petroleum Company (BAPCO)
Scope
of Work:
Construction of New Kero-Merox Plant including structural
steel fabrication and erection, pipelines, piping, equipment
erection, construction of cone roof tanks
Client / Owner: JGC Corporation / Bapco
Project Value: US $ 3, 950, 000.00
Project Execution Duration: 10 months (2000-01)
Manhours: 650, 000 (NLTA)
(Received Safety Award from JGC )
Project
Highlights:
-
Structural steel – 210 Tonnes
-
Piping – 60, 516 Inch-dia. (Hydrotest - 159
systems)
-
Heavy equipment erection - 15 Nos.
-
Construction of cone roof tanks – 2 Nos.
-
PWHT – 9, 912 Inch-dia.
-
Radiography – 934 sheets without a single repair
-
Handed over 2.5 months ahead of schedule.
|
| |
Flue
Gas Desulfurization Plant for Aluminium Bahrain (Alba)
Scope
of Work:
-
Fabrication and erection of steel work for absorber
area, duct platforms, ladders, supporting structures
for flue gas bypass ducts
-
Steel plate construction, complete erection of flue
gas and bypass ducts, dampers and expansion joints
inclusive of holding fixtures
-
Installation and alignment of pumps, fans and tanks
-
Assembly and alignment of absorber/stack
Client/Owner:
Babcock Borsig Power / Alba
Location: Alba Calciner Plant
Project Highlights:
-
FRAP lines of 2 inch to 1.6 meter dia. were fabricated
and installed on site
-
Constructed 600 mm dia. suction and discharge FRAP
lines from seawater circulation pumps
-
New absorber and stack were erected using 400 Tonnes
capacity crane
Project Value: US $ 1,060, 000.00
Project Execution Duration: 7 months (2002 – 03)
Manhours: 79, 927
|
FCCU
Resid Processing Project for Bahrain Petroleum Company
(Bapco)

Scope
of Work:
-
Demolition of existing structures, sheds, piping,
equipment foundations
-
Construction of new foundation sump pit and paving
for new fresh catalyst hopper
-
Fabricate, install structural steel
-
Fabricate, install, test and commission piping systems
-
Erection and alignment of new fresh catalyst hoppers
and associated equipments
-
Fabricate and install new stainless steel catalyst
unloading line from Regenerator and repair existing
catalyst and airline.
Client:
Bapco
Location: Bapco Refinery
Project Highlights:
-
Piping – 5, 890 inch dia. (4 systems)
-
Structural steel – 36 Tonnes
-
Blasting and Painting – 960 Sq. m
-
Tie-ins during shutdown – 109
-
Equipment installed - 10.
Project Value: US $ 950, 000.00
Project Duration: 5 months
Shutdown Period: One month
Manhours: 59, 380
|

|
ALBA
Diversion of Bapco’s 6” Gas Line and 10”
Water Line
Scope
of Work:
Divert existing 6” gas line from BAPCO (US) to
South ALBA Distribution Point (SADP) and the existing
10” irrigation water line from OKB to Riffa’a
Golf Club to make way for the ALBA Line 5 Expansion
Project
Client
: Aluminium Bahrain
Location: Alba Line 5 Expansion Area
Project Highlights:
-
Fabrication, installation, hydro testing of 2.5 km
of 6” gas pipeline and 1.8 km of 10” water
pipeline
-
Installation of cathodic protection for the pipeline
-
Third party inspection for all the pipeline materials
-
Very tight project execution schedule of 17 weeks
-
Project was executed within many constraints including
coordinating with many parties including Bapco, Alba
and Ministry Departments for work permits
Project Value: US $ 720, 000.00
Project Execution Duration: 5 months (2002 – 03)
Manhours: 32, 513 (zero NLTA)
|
 |
Inline
Blending Project for Bahrain Petroleum Company (BAPCO)
Scope
of Work:
Construction of New In Lie Blending Plant including
structural steel fabrication and erection, pipelines,
piping, equipment erection and associated works
Client
/ Owner: JGC Corporation / Bapco
Project Value: US $ 4, 650, 000.00
Project Execution Duration: 12 months (1999 –
2000)
Project
Highlights:
-
Piping – 170, 000 inch-dia.
-
Structural steel – 360 Tonnes (Painting –
4, 075 sq. mtrs)
-
Fabricated and installed a piperack – 120 Tonnes
-
Installation of 40 Heavy duty pumps
-
Pressure testing of 620 piping systems
|
|
| |
©